N 219 as a National Aircraft Program
Indonesia with its vast Geographic Condition and poor infrastructure will still require effective transportation to the remote areas. Humanitarian Transportation is also a necessity.
The Government actually subsidize all remote area Flights (“Perintis” Flights) through guaranteed Total Operating Cost (TOC) for the participating regional airlines.
The C-212 and DHC-6 Twin Otter are currently the backbone of Perintis Flight. Both aircraft have its limitation to continue its service. These are C 212 price, and the age of DHC-6.
Both Aircraft have its own service niche, C 212 are used in low coastal areas and DHC-6 in Mountain Area.
N-219 is designed from the beginning to cover all these issues.
The Government actually subsidize all remote area Flights (“Perintis” Flights) through guaranteed Total Operating Cost (TOC) for the participating regional airlines.
The C-212 and DHC-6 Twin Otter are currently the backbone of Perintis Flight. Both aircraft have its limitation to continue its service. These are C 212 price, and the age of DHC-6.
Both Aircraft have its own service niche, C 212 are used in low coastal areas and DHC-6 in Mountain Area.
N-219 is designed from the beginning to cover all these issues.
17,000 island, 680 Airport and Airstrip
333 have less than 600 m (1968ft) length
333 have less than 600 m (1968ft) length
Enarotali Air Strip
Dado Air Strip
Nabire Airport
ASIA PACIFIC REQUIREMENT Next 20 Years
|
|
- Max Cruise Speed: 213 kts(395 km/hr)
- Economical Cruise Speed: 190 kts (352 km/hr)
- Max ferry range: 1580 Nm
- Range 650 nm at 19 passengers
- Take-off Distance (35 ft obstacle): 465 m, ISA, SL
- Landing Distance (50 ft obstacle) 510 m, ISA, SL
- Maximum take-off weight: 7,270 kg (16,000 lbs)
- Maximum Payload: 2500 kg (5,511 lbs)
- Maximum cruise altitude 10,000 ft
- Rate of climb 2,300 ft/min all engine operative
- Certification DGAC CASR 23, Commuter Category
- The number of system components are much less than the aircraft in it's class.
- No Hydraulic System, Electric Actuators are used for Flap and Nose wheel steering
- All Digital avionics system with 3 LCD Displays (Glass Cockpit). There is integrated GPS-based safety features such as ease of flying IFR and the Terrain Avoidance Warning System (TAWS)
- Integrated Engine indicating and crew alerting system (EICAS)
- Simple Vapor Cycle based Air Conditioning
- Option for Cabin Pressurization
- Pratt & Whitney PT6 Engine Series
N219 Payload-Range Diagram
Interior is adapted for Mixed Cargo-Passenger configuration |
|
Engine Power vs Max Cruise Speed
In order to be successful in Indonesia, The aircraft need to be competitive in Initial Procurement Price and DOC.
SkyTruck M28 | C-212-200 | N219 | |
Selling Price in Indonesia | US$ 4.5 million | US$ 4.5 million | US$ 3.0 million |
Direct Operating Cost | US$ 520/hr | US$ 560/hr | US$ 460/hr |
N 219 is indeed in Preliminary Design stage and require time and expense before entering the production phase. But to have any previous national investment in PT DI and the relatively small size of the aircraft then the cost of development can be suppressed low.
Certification Time | 2 years 9 months since "go ahead" | ||
First delivery | 2 years 9 months since "go ahead" | ||
Development Cost | 73 million US dollar |
Main advantages of the total investment is U.S. $ 223 million, amounting to U.S. $ 150 million would be an investment in the country of Indonesia, the rest is the purchase of foreign components (engines, etc). Also open employment opportunities for 1,000 people for a long period of production.
N219 Flight Coverage at 19 pax
Special application of N219 :
- Special Mission Aircraft
- Aircraft Armament
Disaster Relief Aircraft or Medical Evacuation
Ground Attack aircraft of N 219 can be modified easily on weapon installation for police and military utility :
Perimeter Firing Ground Attack With its own design, then the N 219 can easily be modified adding heavy weapons for ground attack. Perimeter Firing Ground attack, is armed with heavy transport aircraft (usually guns), While on duty, so he flew around the targeted enemy as the target center. U.S. Air Force has a C-130 aircraft with the same system.
Bio Hazard Level III Transport
- Government plan to build hospitlals with capability to deal with infectious diseases by classification of Bio Safety level III, e.g : SARS & Bird Flu.
- Hospital on this classification has special isolation rooms with very strict safety procedures including closed air system settings to prevent the possible spread of the virus out of hospital.
- Maintaining many facilities like is very expensive, whereas the frequency of its use can not be predicted.
When government buy 50 N219 aircrafts from PT DI , then open the possibility of a larger effort for PT DI and also the continuation of its future.
- Market class of this aircraft is wide & large.
- With the improvement of airport infrastructure in industrialized countries these days, then this aircraft class is only growing in developing countries only.
- High labor costs in developed countries makes the aircraft manufacturers in the developed world no longer makes this class of aircraft, but larger aircraft that have a higher selling price. Competition among aircraft maker is more less .
- Potential of PT DI to compete and succeed in this class is very good.
Turboprop aircraft for 19 passengers has very big & wide market potentials
Countries in Asia Pacific whose have small airport are biggest market :
NO | COUNTRY | REQUIREMENT |
1 | Indonesia | 97 |
2 | Malaysia | 25 |
3 | Philippines | 26 |
4 | Thailand | 5 |
5 | Australia | 142 |
6 | China | 6 |
7 | Fiji | 14 |
8 | Japan | 14 |
9 | New Zealand | 69 |
10 | India | 19 |
11 | Maldives | 44 |
12 | Nepal | 31 |
13 | PNG | 52 |
14 | Taiwan | 5 |
Total | 549 |
Civil Aircraft
|
Special Mission in Asia-Pasific ( 20 years)
|
Investors were expected to buy 50 N219 aircrafts for development & production capital. By this capital, PT DI will have new product that competitive on aircraft industry bussiness. Also, this can be potentials effort with following specifications :
IRR : Break Even Point : Period : Aircraft Price : | 15.52 % 118 units Pay Back 10 years 3 M US$ |
Total cumulative profit until 2023 is 308 Millions US$. |
General Undertaking
- N 219 will be done as national project with various government agencies participations.
- The Development Cost approximately US$ 75 Million, will be burdened to the various Government Agencies.
- The current issues will be the “Customer Financing” for the procurement of the aircraft for the participating airlines.
CONTACT ADDRESS :
http://www.indonesian-aerospace.com/contact/
http://www.indonesian-aerospace.com/contact/
Salam kenal, sy yudi supriyono.
ReplyDeletesaya penulis artikel tentang dunia dirgantara dan pertahanan. Tulisan saya bs dilihat di aviasista.blogspot.com
saya mw tny sedikit:
anda tahu banyak tentang PT DI, apakah anda dr PT DI?? Soalnya saya mw tanya tentang program N-219.
Ijin untuk mengambil beberapa foto untuk melengkapi blog saya.thnks.